How to invest in Serbia
 

SUCCESS STORY — CONSTRUCTION

Industrial warehouse 2020/2021

 
 

project manager - danijel lopatnicic

Modern warehouse with administration

 
 

A free-standing low-rack warehouse, with a gross construction area of 3,035.98 m2, located 1.5 km from the regional Kragujevac-Belgrade road in Sobovica industrial zone, in the cadastral municipality of Cerovac. The primary structure of the building is of prefabricated, reinforced concrete, which, in addition to large roof spans, is characterized by excellent fire-retardant properties. The roof structure is made entirely of prestressed trusses, which span up to 24 m, reducing the number of bearing points inside the building and enabling better use of the interior space.

The use of modern materials and solutions for facade and roof covering guarantees durability and exceptional characteristics both in terms of thermal insulation and aesthetics. The warehouse space is designed to meet all standards for storage of materials and finished products from the Siemens Mobility factory, with two crane tracks with a carrying capacity of 5 and 10 tones.

The building includes an administrative section, with accompanying office and sanitary facilities for 30 workers. Part of the warehouse is served by an internal industrial rail track, whose primary function is to connect the warehouse and the production section of the tram factory.

Design of the grounds includes asphalt roadways for heavy traffic, separated from the building and surrounded by green areas. The newly designed building forms an urban, architectural and functional whole with the existing production and administrative facilities on the factory grounds.

The construction work has been organized so as not to affect the functioning of existing facilities and internal traffic infrastructure throughout the period of works, with maximum care for the health and safety of the staff.


Primary function is to connect the warehouse and the production section of the tram factory.

— danijel lopatnicic

 
 
 
 
 

Warehouse construction site timeline

 
 
 

SUCCESS STORY — CONSTRUCTION

Business building 2022/2023

 
 

project manager - danijel lopatnicic

Modern office facility

 
 

We have been colaboration successfully with our business partner Siemens since 2020. In 2020, we built a warehouse within the already existing complex. Today, in 2022, the cooperation continues. At the request of the investor, a new Business building is in construction process with a parking space and an internal road within the complex.

The first phase of construction of the business facility envisages construction of the complete structure of the building, as well as the complete execution of the exterior of the building (facade and roof covering.) The first phase also envisages the complete execution of all interior works on the ground floor and first floor.

 

Business space that will be put to use in the second phase. The office building in first phase includes open-plan offices, meeting rooms, management offices, a software testing laboratory, a rack room, men's and women's toilets, telephone booths, a research center, "meet and talk" spaces and "scrum" zones.

The second phase envisages internal works on the second floor, which will be organizationally identical to the first floor.

 
 
 
 
 
 

 

like our concept?

Want to be member of
Structura team?

Structura Concept starts every project with a team of dedicated experts. We are always looking for individuals who are eager to develop their skills and apply them together to create the best environments for people to produce, work, learn and live their lives.

We are not only interested  in candidates with backgrounds in design, construction management or engineering, but also in people with skills in finance, accounting and business development. We know it takes a diverse team to build the future and we are looking for all types of talent to contribute.